scanellogo blue

 +45 96 22 32 42

Wind references

BLADT INDUSTRIES

BLADT INDUSTRIES

Walney 3
2017
  • 40 wind turbine transition pieces
  • Engineering
  • Purchase
  • Installation
  • Commissioning
SIEMENS WIND POWER

SIEMENS WIND POWER

Dudgeon
2017
  • 67 6 MW WTGs
  • Commissioning 
VATTENFALL

VATTENFALL

Scanel Workshop
2017
  • 2.3 MW WTG
  • Service
  • Rewinding
ST3

ST3

Borkum, Riffgrund 2
2017
  • 20 Jackets
  • Engineering
  • Purchasing
  • Installation
  • Commissioning 
SABIK

SABIK

Nordergrunde
2017
  • OSS
  • Commissioning 
SIEMENS WIND POWER

SIEMENS WIND POWER

Veja Mate
2017
  • 40 6 MW WTGs
  • WiFi Installation
SIEMENS WIND POWER

SIEMENS WIND POWER

Race Bank
2017
  • 8 6 MW WTGs
  • WiFi Installation
FAIRWIND

FAIRWIND

Galopper
2017
  • 16 6 MW WTGs
  • HV/MV Installation
FAIRWIND

FAIRWIND

Veja Mate
2017
  • 36 6 MW WTGs
  • HV/MV Installation
BLADT INDUSTRIES

BLADT INDUSTRIES

Beatrice
2017
  • 30 jackets
  • Engineering
  • Installation
  • Commissioning
BLADT INDUSTRIES

BLADT INDUSTRIES

Walney 4
2017
  • 47 wind turbine transition pieces
  • Engineering
  • Purchase
  • Installation
  • Commissioning
ST3

ST3

Race Bank
2017
  • 91 wind turbine transition pieces
  • Engineering
  • Purchase
  • Installation
  • Commissioning
BLADT INDUSTRIES

BLADT INDUSTRIES

Arkona
2017
  • 60 wind turbine transition pieces
  • Design
  • Engineering
  • Purchase
  • Installation
  • Commissioning
BLADT INDUSTRIES

BLADT INDUSTRIES

Burbo Bank
2016
  • 32 wind turbine transition pieces plus mock-ups
  • Engineering
  • Purchase
  • Installation
  • Commissioning
BLADT INDUSTRIES

BLADT INDUSTRIES

Veja Mate
2016
  • 67 wind turbine transition pieces
  • Engineering
  • Purchase
  • Installation
  • Commissioning
SIEMENS WIND POWER

SIEMENS WIND POWER

Gode Wind
2016
  • 12 3.6 MW WTGs
  • Commissioning
MHI VESTAS

MHI VESTAS

Lindø production
2016
  • Nacelles 8 MW WTG
  • Pre-assembly

SIEMENS WIND POWER

SIEMENS WIND POWER

Gemini
2016
  • 40 3.6 MW WTGs
  • Pre-assembly
  • MV/HV test
BLADT INDUSTRIES

BLADT INDUSTRIES

Gode Wind
2015
  • 80 wind turbine transition pieces
  • Engineering
  • Purchase
  • Installation
  • Commissioning
BLADT INDUSTRIES

BLADT INDUSTRIES

Sandbank
2015
  • 72 wind turbine transition pieces
  • Engineering
  • Purchase
  • Installation
  • Commissioning
VATTENFALL

VATTENFALL

DanTysk
2015-2016
  • 80 3,6 MW WTGs
  • Electrical repair
  • Commissioning
BLADT INDUSTRIES

BLADT INDUSTRIES

Sandbank
2015
  • 20 wind turbine transition pieces
  • Repair
SIEMENS WIND POWER

SIEMENS WIND POWER

Baltic 2
2015
  • 80 3.6 MW WTGs
  • Electrical repair
  • Improvement
BLADT INDUSTRIES

BLADT INDUSTRIES

Baltic 2
2015
  • 80 transition pieces/jackets
  • Electrical completion
BLADT INDUSTRIES

BLADT INDUSTRIES

Butendiek
2015
  • 10 wind turbine transition pieces
  • Prepair 
Siemens Wind Power

Siemens Wind Power

Borkum Riffgrund
2014 - 2015
  • 78 4 MW WTGs
  • Pre-assembly
  • High-voltage testing
Bladt Industries

Bladt Industries

Butendiek Offshore Windfarm
2014
  • 80 wind turbine transition pieces
  • Engineering
  • Purchase
  • Installation
  • Commissioning
Bladt Industries

Bladt Industries

Jacobs and Enercon wind turbine towers Purchase and installation of:
  • Switchgear platform
  • Cable trays
  • Light installation
Vattenfall

Vattenfall

Repair, service and maintenance of wind turbine generators
  • Rewinding
  • Exchange of bearings
  • General overhaul
  • Dynamic balancing
Siemens Wind Power

Siemens Wind Power

Westermost Rough
2014
  • 6 MW WTGs
  • Pre-assembly
  • High-voltage testing
Siemens Wind Power

Siemens Wind Power

Amrumbank West
2014
  • 80 3.6 MW WTGs
  • Installation
  • Commissioning
Bladt Industries / RWE

Bladt Industries / RWE

Gwynt Y Mor Irish Sea, wind farm
2013
  • Wind turbine transition piece (160 pcs)
  • Engineering
  • Purchase
  • Installation
  • Commissioning
Bladt Industries

Bladt Industries

2012
Gunfleet Sands Wind Farm, Mock-up for 6 MW Siemens wind turbine transition piece electrical systems:
  • Engineering
  • Purchase
  • Installation
Local investor

Local investor

1997
Røgild, Arentsminde, Nordtank 600 KW wind turbines.
Purchase and installation of:
  • 10 kV installation
  • Transformer installation
  • 690 V installation
VATTENFALL

VATTENFALL

Scanel Workshop
Various years
  • WTGs
  • Repair
  • Service
  • Maintenance
  • Rewinding
  • Bearings
  • Dynamic balancing
  • Overhaul
Danish Wind Energy

Danish Wind Energy

1995
Stenes Enge, Tylstrup, Wind World 600 kW wind turbines.
Purchase and installation of:
  • 10 kV installation
  • Transformer installation
  • 690V installation

Customer satisfaction

100%

Customer satisfaction
100%

Surveyed: Technical staff at 15 customers at project completion January-July 2017


Customer ratings & feedback

CERTIFICATES

  • dnv nyt
  • achillesjqs
  • sllicha
  • n
  • iec
  • iecex